The Challenge was to relocate 440 + Scientists and 160 support staff, laboratories, equipment and technology departments in an 8 week window with minimal downtime to staff and on-going research projects. The total number of crates packed and unpacked for the project was: 9,000 not including specialist crates for chemical and IT moves.
Restore Harrow Green developed innovative rapid response ‘Hot Teams’. They were tasked with daily crate delivery and collection, material delivery to LMB staff, relocating specialist and general equipment at short notice and packing of equipment / glassware / file material. The Hot Teams were flexible in size. They were invaluable to the success of the project.
The project required Restore Harrow Green to disconnect, move and reconnect approximately 600 Mac / PC IT desk top units. Two Restore Harrow Green dedicated IT staff assisted the LMB IT department in the New building for 8 weeks. We were also tasked to move all the LMB’s server equipment; this included project planning the server relocation.
This meant that all servers were audited and documented in preparation, followed by the physical decommission of all hardware, packing in purpose built and secure server cases, then the recommissioning of all servers including connectivity. On completion Restore Harrow Green completed a de-brief, and handed over documented proof verifying that all servers were installed and working.
The move was planned so that each Science Division was given a specific number of days over which they moved, then a maximum of 2 days to complete their move. Restore Restore Harrow Green completed the move to timetable with no overrun! The downtime to science research projects was expected to be 7 days and the reality was they were up and running within 3 to 4 days.
download case study
As site co-ordinator for the new LMB building I worked closely with the Restore Harrow Green staff during the move period. The team were professional, flexible, enthusiastic and provided a seamless move to the new building. In a short time the Restore Harrow Green Team built up an exceptional rapport with the scientists and LMB staff and were seen as part of the LMB team.
Sue Kemp - Senior Consultant, Life Sciences Cambridge LMB Project